Intelligent Operations Center

● LIVE Dam: Ulu Padas Dam, Sabah Downstream: 12 Villages Monitored
🏗️
NORMAL
Dam Status
Structural integrity: 99.2%
🌊
67.3m
Reservoir Water Level
Normal pool: 70.0m | Capacity: 82%
🌧️
42mm
24h Cumulative Rainfall
Forecast: Heavy rain next 6h
🏠
12/12
Downstream Villages
All safe — No evacuation needed
💧
87
Water Quality Index
Good — All parameters normal
📡
47/48
Active Sensors
97.9% online | 1 maintenance

Reservoir Water Level — 72h Trend

● LIVE

Upstream Rainfall Stations

Dam Gate Discharge

IoT Sensor Network

● 47 ONLINE 1 OFFLINE

Digital Twin — 3D Dam & River Basin

● REAL-TIME 3D SYNC WebGL Accelerated
Dam & Reservoir
Downstream Villages
Sensor Stations
Flood Inundation Depth:
Shallow (0–0.5m)
Moderate (0.5–1.5m)
Deep (1.5–3m)
Extreme (3m+)

Digital Twin Status

Last Sync2 sec ago
Data Points/s1,247
Model Accuracy94.7%
Render FPS60

Dam Parameters

Water Level67.3m
Storage Volume142M m³
Inflow Rate285 m³/s
Outflow Rate120 m³/s
Gate Openings3/5 open

🌊 Flood Simulation

Run what-if scenarios — animated 3D flood visualization

Flood Early Warning System

Forecast → Warning → Rehearsal → Preplan (四预)
Monsoon Surge
Night Storm Burst
Gate Constraint Event

Use Case: Monsoon Surge at Ulu Padas

SCENARIO READY

Heavy upstream rainfall drives reservoir level rise, forcing staged warning escalation and downstream pre-positioning before peak inflow.

T+0h to T+8h
Yellow to Orange
1,850 persons on standby
Pre-position evacuation teams and issue village advisory

Interactive Response Flow

01
🔮
FORECAST
6h Rainfall Forecast 78mm
24h Rainfall Forecast 156mm
Peak Water Level (est.) 69.1m
Time to Peak 8.5 hours
02
⚠️
WARNING
BLUE Water Level > 68m ● Armed
YELLOW Water Level > 69m ● TRIGGERED
ORANGE Water Level > 70m ○ Standby
RED Water Level > 71m ○ Standby
03
🎯
REHEARSAL
Evacuation Route A — 2026-03-10
Gate Operation Drill — 2026-02-28
Full Evacuation Drill — Scheduled 2026-04-05
04
📋
PREPLAN
Evacuation Centers
6 Active
Total capacity: 4,200 persons
Response Teams
12 Teams
52 personnel on standby
Equipment
Deployed
Boats: 8 | Vehicles: 15

Dam Safety Monitoring

● STRUCTURAL HEALTH MONITORING

Seepage Monitoring (Piezometers)

Deformation (GPS/InSAR)

Downstream Water Level

Upstream Water Level

Water Quality Monitoring

● REAL-TIME WQI
Catchment + Reservoir + Downstream Intake

Multi-point water quality assurance with treatment readiness

Track source water, raw intake, and treated outlet conditions in one operating surface so operators can anticipate quality drift before compliance is affected.

Online Stations 12 / 12
Compliance 98.4%
Treatment Headroom 6.5 hours

Water Quality Index (WQI)

pH / Dissolved Oxygen

Turbidity / Ammonia

Station Snapshot

Compliance & Treatment Actions

Parameter Current Control Limit Trend Operational Action

Recent Laboratory / Operator Notes

SOP Automation

● AUTOMATED RESPONSE

Scenario Library

AI Copilot / Operator Briefing

Playbook: Flood Warning Escalation

See how the assistant composes approvals, operator dispatch, gate commands, and public notifications into one orchestrated SOP run.

Automation Impact